SCOPE
This project involves the replacement of an existing culvert for Redondo Creek. The current culvert does not have enough capacity to handle high levels of water flow. The project will replace the failed culvert with one that is fish-passable.
SCHEDULE
This project is currently being designed by a consulting firm, GeoEngineers. Construction is planned for summer of 2023.
DOCUMENTS
Jan 2022 - Project/Survey Notice - English, Spanish, Korean, Russian, Vietnamese