Business Park Master Land Use Application          

Pre-Application Documents

Original UP & SEPA Submittal

Resubmittal Documents (04/30/2018)

Lakefront Boundary Line Adjustment (BLA)

Original Submittal

  • Cover Letter      
  • Master Land Use Application
  • Simplified Sketch
  • BLA Drawings
  • Existing Conditions Report
  • Updated Title Report
  • Lot Closures
  • Response Letter              
  • Revised BLA Map

Resubmittal Documents (05/03/2018)

  • Response Letter
  • BLA Drawings
  • Buildable Area Exhibit
  • Existing Conditions Report Response
  • Deed – Tract 52
  • Deed – Tract 53
  • Statutory Warranty Deed
  • State Plat Map

USACE Mitigation Site Pre-Application

Original Submittal

  • Cover Letter
  • Master Land Use Application
  • Invoice
  • Site Plan
  • PCN Submittal
  • Pre-Application Letter (from City)

Warehouse A

Original UP Submittal

  • Cover Letter
  • Completed Master Land Use Application 
  • Invoice
  • Concurrency Application
  • Summary Letter from Pre-Application Conference
  • Title Report
  • Water & Sewer Availability
  • Site Photographs from Compass Point
  • SEPA Checklist - 07/19/2016
  • Preliminary Drainage Grading & ROW Plan
  • Preliminary Landscape Plan
  • Building Elevations Design Intent
  • Clearing & Grading Plan 1
  • Clearing & Grading Plan 2
  • Legend
  • Topographic Survey
  • Tree Vegetation Retention Plan
  • Preliminary Information Report (TIR) - 06/16/2016
  • Parking Study
  • Critical Areas Report
  • Geotechnical Report
  • Assessor Map Notification
  • Properties within 300 Feet of Site
  • Notification Map
  • Traffic Impact Analysis
  • Lighting Plan 
  • Site Plan
  • Critical Areas Addendum - 1994 FWCC
  • Process III Submittal Requirements
  • SEPA Requirements

SEPA

  • Environmental Checklist
  • MDNS Greenline Warehouse A
  • MDNS Notice
  • Modified MDNS Greenline Warehouse A
  • Site Plan 
  • Staff Evaluation
  • Threshold Determination Letter
  • Vicinity Map

Street Modification

  • Technical Review Comments (4th)
  • Comparison
  • Response to Revision Request
  • Modification Decision

Transportation Concurrency

  • Traffic Concurrency Application
  • Capacity Reserve Certificate (CRC)
  • Service Trips
  • Concurrency Level of Service (LOS) Summary
  • Trip Generation

1st Technical Letter

  • Preferred Freezer Complete Application and Technical Review Comments Letter - 07/29/2016
  • Solid Waste & Recycling Design Guidelines Handout

Resubmittal - 08/12/2016

  • Resubmittal Information
  • Comment Response Letter
  • Revised SEPA Checklist - 08/08/2016
  • TIR - 08/11/2016
  • TIA - 08/11/2016
  • Civil Plans
  • Impervious Area Exhibit
  • Fence Cut Sheet
  • Sign Detail
  • Elevation 1
  • Elevation 2
  • Talasea Letter to Planner - 08/08/2016
  • Sign Narrative

2nd Technical Letter

  • LHUD Public Comments Response - 09/27/2016
  • ESA Preferred Freezer Review - 10/05/2016
  • Preferred Freezer Technical Review Comments - 10/07/2016

Resubmittal - 04/03/2017

  • Response Letter
  • Design Narrative & P3 Decisional Criteria
  • Revised SEPA Checklist
  • TIA Plan Set
  • Illumination Calculations
  • TIA Auto Turn Exhibits
  • Revised TIA
  • Revised TIR
  • Revised Critical Areas Report and Conceptual Mitigation Plan
  • Revised Plan Set
  • Memo to ESA 
  • Revised Geotechnical Report
  • Arborist Report
  • Managed Forest Buffer Management Plan
  • Construction Impact Report
  • Impervious Area Exhibit
  • Letter to DAHP
  • Air Quality Report
  • Noise Report
  • Photographic Study
  • Title Report
  • Master Land Use Application (MLUA)
  • Water & Sewer Certificate

3rd Technical Letter

  • Dept of Archaeology & Historic Preservation Letter - 04/24/2017
  • ESA Letter - 06/24/2017
  • Warehouse A Technical Comments Letter - 06/27/2017

Resubmittal - 08/25/2017 & 10/05/2017

  • Response Letter
  • Revised Process III Plan Set
  • Revised Building Elevation Design Intent
  • Revised SEPA Checklist
  • LHUD Hydraulic Fire Flow Estimate
  • Revised Air Quality Technical Report
  • Revised Technical Information Report (TIR)
  • Qualification Letter from Brian Gilles
  • Forest Buffer Management Plan
  • Managed Forest Buffer Management Plan (MFBMP) Construction Impacts
  • Tree Count Report
  • Existing Tree Plan
  • Talasaea's Response to ESA Comments
  • Revised Critical Areas Report
  • Revised Traffic Impact Analysis (TIA)
  • Pavement Analysis

4th Technical Letter

  • Warehouse A Technical Review Comments Letter - 01/26/2018

Resubmittal - 03/13/2018

  • Response Letter
  • Process III Plans
  • Building Elevations
  • SEPA Checklist
  • Geotechnical Report
  • Traffic Impact Analysis (TIA) - 03/06/2018
  • Critical Areas Report & Buffer Averaging Plan - 03/02/2018
  • Managed Forest Buffer (MFB) Construction Impact Report - 03/02/2018
  • Tree Count Report - 03/02/2018
  • MFB Management Plan - 03/02/2018
  • Air Quality Report
  • Letter to Parcel - 03/06/2018
  • Impervious Area Exhibit
  • Joint Aquatic Resources Permit Application (JARPA)
  • Technical Impact Report - 03/12/2018
  • Evaluation of Interior Trees
  • Greenline Signed SEPA Checklist
  • MFB Management Plan for Building A
  • Revised Arborist Reports Memo
  • Revised Tree Retention Plan
  • Tree Data for 32 Acre Site

Boundary Line Adjustment

  • Complete Application - 04/26/2017
  • Technical Comments - 06/16/2017
  • Wetland Review - 08/18/2017
  • Technical Comments - 10/17/2017
  • Approval - 10/30/2017
  • Recorded BLA

Decision Letter and Exhibits

  • Approval Letter
  • Approved Elevations
  • Approved Landscape Plan
  • Approved Site Plan
  • Commercial Building Permit Checklist
  • Exhibit A - Findings for Project Approval
  • Letter from LHUD - 09/27/2016
  • ROW Modification - 06/22/2018

Warehouse B

​Original UP Submittal

  • Master Land Use Application (MLUA)
  • Traffic Concurrency
  • Cover Letter
  • Title Report
  • Water & Sewer Availability
  • Site Photos
  • Signed SEPA Checklist
  • Process III Plan Set
  • Building Elevations Design Intent
  • Preliminary Technical Information Report (TIR)
  • Traffic Impact Analysis
  • Critical Areas Report
  • Geotechnical Report
  • Pavement Analysis Report
  • Tree Inventory for Warehouse A & B
  • Forester Credentials
  • MFB Management Plan
  • Impervious Surface Area
  • Assessor Map 1
  • Assessor Map 2
  • Assessor Map 3
  • Tree Evaluation Report

1st Technical Letter

  • Technical Letter - 04/05/2018
  • ESA Memo

Resubmittal - 06/28/2018

  • Response Letter
  • Narrative Memo
  • Revised Plan Set
  • Impervious Surface Area
  • Design Narrative & Building Elevations
  • SEPA Checklist
  • Preliminary TIR
  • TIA
  • Revised Geotechnical Report
  • Critical Areas Report
  • Response to ESA Comments
  • Wetland Exemption Exhibit
  • Managed Forest Buffer Management Plan
  • Tree Data - 32 Acre Site
  • Tree Evaluation Report
  • Building B Noise Report
  • Greenline Building B Report
  • Revised SEPA Checklist
  • Visual Report
  • Visual Study Greenline Building B Elevation Views