PROJECT LOCATION

This project is located throughout multiple reaches along Cold Creek between North City Limits near S 293rd Street and 10th Avenue S.


PROJECT SCOPE

This project will look at a sequence of projects to reduce upstream erosion, install grade controls and stabilization downstream, reduce flooding, improve water quality, and replace the pipe or reopen the stream channel near the Marine Hills pool. GeoEngineers has been hired to prepare a Basin Study and Prioritization Report that will inform the projects.


PROJECT SCHEDULE

2028-2030


PROJECT FUNDING

The funding for this project includes a King County Flood Reduction Grant.


PROJECT UPDATE

  Cold Creek Basin and Study Area


PROJECT CONTACT

Charskie Kinloch, E.I.T.

Civil Engineer

ckinloch@federalwaywa.gov

(253) 835-2717


For additional details on this project or to find out more about other capital projects within Federal Way, click HERE to check out the City's interactive capital project map and dashboard.