This project shall consist of: Furnishing all materials, equipment, tools, labor and other work or items incidental thereto (excepting any materials, equipment, utilities or service, if any, specified herein to be furnished by the Owner or others), for the construction, sequencing and traffic control plan for overlaying existing asphalt concrete pavement in eight (8) different locations within the City of Federal Way. The work shall include, but is not limited to: Hot Mix Asphalt (HMA CI. 1/2" PG 58H-22) pavement overlay (approximately 7,500 tons), roadway excavation, planing bituminous pavement, pavement repair, removal and replacement of curb and gutter, sidewalk, curb ramps, traffic curb, repairing or re-aligning manholes and catch basins, traffic signal detection loops, pedestrian push button and foundation, channelization, restoration, utility adjustments, and all items necessary to complete the work as described in the Contract Documents.
The City anticipates awarding this project to the successful bidder and intends to give Notice to Proceed as soon as the Contract and all required documents are executed in full. Regardless of the date of award or Notice to Proceed, the Contractor must complete all work within 100 working days.
All bids and this Project shall be governed by the Contract, as defined by the Washington State Department of Transporation Standard Specifications for Road, Bridge, and Municipal Construction 2020 (Standard Specifications), which is incorporated by this reference as though set forth in full.
All bid proposals shall be in accordance with the Contract and all bid proposals shall be accompanied by a bid deposit or bond in the amount required in the Contract. Forfeiture of the proposal bond or deposit to the City shall be in accordance with the Contract.